Disassembly and installation of pressure transmitter

Pressure transmitter removal:

Preparation tools: two adjustable wrenches, an explosion-proof Phillips screwdriver, white tape, insulation tape, detector XP3140.

1. Close the root valve and inlet valve of the pressure transmitter, open the vent valve, and wait until the detector XP3140 confirms that the combustible gas is empty before closing the vent valve.

2. Confirm that the pressure transmitter power supply between the cabinets has been unloaded;

3. Unscrew the pressure transmitter cover with a plum blossom driver, remove the signal cable, and protect the signal cable and its cable label with insulating tape;

4. Use a spanner wrench to remove the transmitter pressure tube connector and use an insulating tape to properly protect the head of the pressure tube.

5. Remove the transmitter fixing screw and take the transmitter off the bracket. 6. Clean the dust on the surface of the transmitter. Use a white tape to make the device label stick to the surface of the transmitter. 7. The transmitter will send it to the school. Inspection site and place it for more than 2 hours, to be verified.

Installation of pressure transmitter:

Preparation tools: two adjustable wrenches, an explosion-proof Phillips screwdriver, leak detection fluid.

1. Confirm that the pressure transmitter power supply between the cabinets has been unloaded;

2. Confirm that there is no debris in the head of the transmitter pressure pipe joint and the pressure pipe;

3. Mount the transmitter on the bracket and fasten the fixing screw with a screwdriver;

4. Use a spanner to connect and fix the pressure transmitter pressure tube fittings;

5. Disassemble the pressure transmitter cover with an explosion-proof Phillips screwdriver and correctly connect the signal wires according to the terminal wiring diagram.

6, connect the transmitter power supply;

7. Use the HART communicator in the station control room to perform zero and full calibration;

8. Confirm to open the pressure transmitter root valve and intake valve and close the vent valve;

9. Check the leaks with the leak test fluid.

Lifting Clamps

Lifting clamp



Details:

1. Use: Apply for steel-plate horizontal or vertical hoist and overturn of the section steel

2. Loading range: 0 to 10 ton.

3. It is manufactured by low-carbon hi-quality alloy steel forging.

4. Rated load caused by 1 tests is regarded as the standard, during the hoist, can use one crane, but during the horizontal hoist, must add the beam.

5. During the hoist, hung articles are forbidden collision.

6. Test load is the max, operation load of 2 times.

7. Don`t overload to use.



Our Services

1.Client

We treasure and try to understand all the different needs of our clients and seek to forge a long term professional relationship with them. The satisfaction of each and every customer is our main goal and motivation in conducting our business.

2. People

We work as a team and treat each other with respect. Our solid, capable and knowledgeable team is valued as the greatest asset and an integral part of the business.

3. Product

Our products are of HIGH quality standards and always come with certificate of compliance by the manufacturers.

4. Performance

We aim to achieve high level of performance and satisfaction to both our client and people, which include delivering high quality services and treating people with integrity.

5. Free sample and OEM service

We can provide free samples to you and we also have OEM service, we can put your logo on the label and the information you need on the webbing too.

1

lifting plate clamps


Horizontal Lifting Clamps,Lifting Clamps For Plates,Vertical Lifting Clamps,Adjustable Lifting Clamps

Hebei Liston Lifting Rigging Manufacturing Co., Ltd. , https://www.liftingriggings.com