Wireless audio and video transmission in the factory area, system clear and stable wireless monitoring transmission implementation program

I. On-Site Situation The site is a factory area with four floors of a factory building, a three-storey office building surrounded by walls. One camera is installed in each plant, four cameras are installed in the office building, and a total of eight cameras are installed around the wall. The camera is a 2 million network HD camera. The highest point is the office building. The point of non-line-of-sight with the monitoring center can be transmitted to the highest office building and then back to the monitoring center. Other points are unobstructed and digital microwaves can be used.

Second, the solution The front-end 16 cameras, each with a LA-5830F wireless bridge transmission signal. A total of 16 LA-5830F wireless bridges are required.

The transit point is set in the upper and lower corners of the three-story office building. The upper left corner uses a LA-5830F wireless bridge to receive the signals from the left 2 plants and the 3 wireless bridges in the upper left corner, using a switch and the point. After the camera's signal is concentrated, it is transmitted through a LA-5830F wireless bridge. In the upper right, a LA-5830F wireless bridge is used to receive the signal from the upper right corner of the building, the upper right corner fence, and the 3 central wireless bridges on the fence wall. The 5830F Wireless Bridge launches. A total of 2 LA-5830F wireless bridges are required as transit receiving bridges.

The receiving end uses four LA-5830F wireless bridges to receive signals from the front-end wireless bridge. After the receiver receives the signal, it enters the switch and then goes to the hard disk recorder (NVR) to store the signals.

Third, the system diagram (probably schematic)

Garment Management Data

Software is a specialized action time predeterming system designed for sewing industry, an easy and understandable method analysis technique and can be used for evaluating such operations as sewing, ironing, inspecting and packing. The program achieve real-time data collection, to ensure the production flow, order delivery time. To achieve the establishment of a transparent and efficient wage system, improve the enthusiasm of employees. To achieve the establishment of scientific quality control system, reduce the repair rate. Also achieve real-time dynamic management of each parking space, each process, each employee. At same time provide scientific, reasonable and accurate data base for lean production management and strategic decision. It has few features, as Standardized management, Automatic operation, Data-based information, Timeliness of problem, Accurate calculation of pieces by employees, Real-time order tracking, Real-time worker monitoring, Real-time target management and QC automation.

Garment Management Data,Production Site Management Program,Clothes Making Process Analysis System,Clothing Industrial Engineering Box

Changshu Bealead Automatic Machine CO., LTD. , https://www.bealeadglobal.com